Project Duration

16 weeks

Project Size

4,500 sqft

Sector

Steel Manufacturing

Project Background and Objectives

 
Caunton Engineering engaged Opus 4 to carry out a full back-to-shell rip-out and complete CAT A & CAT B fit-out of their 1970s brick-built production office and staff facilities. The goal was to modernise the space to meet current building regulations, improve energy efficiency, and create a durable and highly functional work environment for employees transitioning from the manufacturing floor.

The project involved office, breakout, toilet, shower, and changing facilities, all designed to support productivity and comfort while incorporating the latest in sustainable building solutions.

Caunton Engineering Ph1 27
Caunton Engineering Ph1 31
Caunton Engineering Ph1 22
Caunton Engineering Ph1 30

Solutions and Approach

 
To deliver Caunton Engineering’s vision, Opus 4 implemented the following solutions:
 

Sustainable & Energy-Efficient Upgrades
  • Installed heat pump air-conditioning systems for improved efficiency
  • Integrated LED lighting throughout the space to reduce energy consumption
  • Upgraded power and CAT6 data cabling for seamless connectivity
Functional & Collaborative Workspaces
  • Open-plan office areas to encourage collaboration
  • Breakout and collaboration zones for informal meetings and downtime
  • Meeting and conference rooms with integrated audio-visual technology
  • Toilet, shower, and locker facilities to accommodate production staff
Interior Enhancements & Compliance
  • Installed acoustic-rated partitions and glazed walls to manage sound transfer
  • Upgraded with DDA-compliant laminate doors and fire breaks for accessibility and safety
  • Integrated bespoke joinery and built-in storage solutions
  • Applied feature wall branding and graphics to reflect company identity
Furniture & Finishing Touches
  • Fitted out the space with modern office furniture, including desking, seating, and meeting room solutions
  • Added window blinds for improved privacy and light control
  • Installed durable flooring suitable for high-traffic industrial use
Caunton Engineering Ph1 6Caunton Engineering Ph1 4Caunton Engineering Ph1 34Caunton Engineering Ph1 8Caunton Engineering Ph1 25Caunton Engineering Ph1 27Caunton Engineering Ph1 29View More

Challenges and Solutions

Adapting a Legacy Industrial Building

The structure of the 1970s building required significant remodelling to bring it up to modern standards.

  • Solution: A full CAT A & CAT B refurbishment, incorporating modern infrastructure while maintaining structural integrity.
Ensuring Durability for High-Use Areas

The new space needed to withstand frequent use by manufacturing staff.

  • Solution: Used high-durability materials, easy-to-maintain finishes, and robust M&E solutions to ensure longevity.
Integrating Modern Technology & Sustainability

Upgrading the workspace with modern electrical and mechanical systems while improving efficiency.

  • Solution: Installed sustainable HVAC solutions, energy-efficient lighting, and advanced IT & data cabling.
Caunton Engineering Ph1 4

Results and Benefits

 
The project was successfully delivered on time and within budget, creating a modern, functional, and sustainable workspace for Caunton Engineering. Key outcomes included:

  • Optimised Work Environment: A purpose-built office space that improves efficiency and collaboration.
  • Durability & Functionality: High-performance materials and thoughtful design ensure long-term usability.
  • Energy Savings: Sustainable M&E solutions reduce running costs and improve environmental performance.
  • Enhanced Staff Facilities: New toilet, shower, and breakout spaces provide greater comfort for employees.
Caunton Engineering Ph1 1

Key Takeaways

  • Upgrading Industrial Spaces: Successfully modernised a legacy manufacturing office into a high-performance workspace.
  • Sustainable & Future-Proof Design: Integrated energy-efficient systems and durable materials for long-term impact.
  • Improved Employee Experience: Designed a functional and comfortable environment that supports both office and production teams.

Start your project today

    Branded Graphic
    Get In Touch