Project Duration

8 weeks

Project Size

102,000 sqft

Sector

Events / Logistics / Commercial Office

Project Background and Overview

Sterling Event Group required a new operational headquarters close to Manchester Airport to support a growing events and logistics operation.

The brief was to maximise usable space within a large industrial unit while creating office, meeting and welfare environments for a growing workforce.

The programme was fixed, with an 8-week delivery window.

5 Sterling 1D0A4842 copy
12 Sterling 3Z7A2722 copy
19 Sterling 3Z7A2745 copy

Solutions and Approach

  • The solution centred on space expansion through a mezzanine floor, creating additional usable area without increasing the building footprint.
  • The mezzanine level provided space for office accommodation and supporting functions, with operational activity retained at ground level.
  • The internal layout was planned to create clear zoning between workplace and operational areas, with straightforward circulation routes.
  • The design uses a dark, industrial colour palette across shared and breakout areas, giving these spaces a clear identity that reflects the operational nature of the business.
  • Black ceilings, dark wall finishes and feature lighting are used to define communal areas, creating contrast with the brighter, functional office zones.
1 Sterling 1D0A4815 copy25 Sterling 3Z7A2805 copy24 Sterling 3Z7A2783 copy26 Sterling 1D0A4930 copy23 Sterling 3Z7A2772 copy22 Sterling 3Z7A2761 copy21 Sterling 3Z7A2758 copyView More

Challenges and Solutions

  • The key challenge was programme: delivering a 102,000 sq ft environment within 8 weeks required clear sequencing and early coordination.
  • Structural elements, services installation and internal fit-out activities were planned in defined stages to maintain momentum and avoid rework.

Results and Benefits

  • The completed facility provides Sterling Event Group with expanded workspace capacity within the existing building volume.
  • The mezzanine created additional floor area for teams and support functions, helping the space accommodate growth.
  • The finished environment includes a mix of open work areas, meeting rooms and welfare space, suited to a fast-paced operational setting.
  • Workspaces are kept deliberately simple and consistent, supporting clarity, focus and ease of use as teams grow.
  • Acoustic pods and enclosed rooms provide quiet spaces for focused work, private calls and confidential conversations, helping teams work effectively alongside open, busy operational areas.

Key Takeaways

  • Mezzanine floors are an effective way to expand capacity in industrial buildings
  • Fixed programmes demand disciplined sequencing and early coordination
  • Clear zoning helps office and operational functions work alongside each other